Cineworld - Bracknell
Key facts & challenges
- Short Description
- The £240 million regeneration of Bracknell town centre is one of the largest urban renewal projects in the UK. It comprises over one million square feet of development including the flagship 'Lexicon' complex -a new shopping and leisure destination for the town developed through a joint venture by Legal & General and Schroders. The Lexicon includes a 12-screen Cineworld multiplex, a state-of-the-art immersive cinema with a 4DX screen that stimulates all five senses with special effects such as wind, water and smell. Siniat worked closely with project architects Chapman Taylor, main contractors Mace and drylining contractor Fireclad to develop a high-performance drylining system for this high-tech facility, providing expert advice throughout the eighteen-month build period.
- Sector
- Leisure
- Client
- Cineworld, Bracknell
- project
- Cineworld, Bracknell
- Contractor
- Mace
- Subcontractor
- Fireclad
- Location
- Bracknell, Berkshire
- country
- UK
- shortInstallDescription
- “Siniat products are easy to work with and behind every piece of kit is a knowledgeable support team ready to offer technical advice whenever it’s needed.”
- installQuoteAuthor
- Rod Secluna, Fireclad (installation subcontractor)
- impactQuote
- “Siniat worked closely with the acoustic engineer and our specification writer to ensure the construction details and materials specified met the stringent acoustic requirements of the cinema.”
- impactQuoteAuthor
- Lucy Flintoff Associate Director, Chapman Taylor
Project description
The £240 million regeneration of Bracknell town centre is one of the largest urban renewal projects in the UK. It comprises over one million square feet of development including the flagship ‘Lexicon’ complex –a new shopping and leisure destination for the town developed through a joint venture by Legal & General and Schroders.
The Lexicon includes a 12-screen Cineworld multiplex, a state-of-the-art immersive cinema with a 4DX screen that stimulates all five senses with special effects such as wind, water and smell. Siniat worked closely with project architects Chapman Taylor, main contractors Mace and drylining contractor Fireclad to develop a high-performance drylining system for this high-tech facility, providing expert advice throughout the eighteen-month build period.